Customer Name:
|
US Army Corps of Engineers |
---|---|
Name/Title:
|
Bob Simon / Facilities Project Manager |
Address:
|
Brooke Army Medical Center |
Facilities (MEDCOM) | |
3551 Roger Brooke DriveFort Sam Houston, Texas 78234-6200 | |
Project Name:
|
Ft. Sam Houston BH-1 |
Contract Number:
|
W912DY-10-C-0035 |
Prime Contractor:
|
ECHO DCL, Inc. |
Contract Type:
|
FFP |
1. Contract Date:
|
September 27, 2010 |
2. Mobilization Date:
|
January 4, 2011 |
3. Completion Date:
|
April 6, 2011 |
5. Location:
|
Ft. Sam Houston, Texas |
ECHO DCL completed the design and construction of one modular Behavioral Health Clinic for a total of 22,990 square feet. Scope of work included design, engineering, and manufacturing. HVAC systems were designed to comply as a Transition Medical Space with UFC 4-510-01 Design: Medical Military Facilities & UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings. This includes proper air changes and pressurization per room, unit modifications for air intake height and emergency shutdown of the HVAC system. Complete turnkey construction included delivery, set-up, fire alarm/mass notification, fire sprinkler, site and building communications, site and building water, sewer and electric, sidewalks, 78,000 square foot parking lot, fencing, gutters, awnings, decks, steps and ramps. An ECHO DCL Superintendent was present from Start to Finish.