Healthcare

Fort Lewis Modular Medical Clinic

As of March 1, 2020 ECHO DCL acquired the assets of Icon Construction. Please visit this link to learn more about ECHO DCL's vision for modular building design, construction and logistics: Click Here

Modular Medical Building

Icon completed the design and construction of three modular embedded health clinics for a total of 15,165 square feet. These facilities are being used to help soldiers coming home from their tour in Afghanistan and Iraq.

Modular Construction: Scope of Work

Scope of work included design, engineering, and manufacturing. Complete turnkey construction included delivery, set-up, foundation and excavation, fire alarm, fire sprinkler system to meet NFPA 72, interior building communications, site and building water, fire water, sewer and electric, awnings, decks, steps and ramps, furniture, sidewalks and hydromulching. Icon was on-site from mobilization to the completion of all work. An Icon Superintendent was present from Start to Finish.

Customer Name: Fort Lewis Embedded Health Clinic

Address: US Army Corps of Engineers

Project Name: Fort Lewis EBH
Contract Number: W912DY-12-C-0018
Prime Contractor: Icon Construction, Inc.
Contract Type: FFP

1. Contract Date: September 30, 2013
2. Mobilization Date: June 4, 2013
3. Completion Date: January 31, 2014

4. Location: Fort Lewis, WA