Fort Campbell Modular Medical Clinic

Modular Medical Building

ECHO DCL completed the design and construction of four modular embedded health clinics for a total of 20,220 square feet. These facilities are being used as embedded health facilities.

Modular Construction: Scope of Work

Scope of work included design, engineering, and manufacturing. Complete turnkey construction included delivery, set-up, fire alarm, fire sprinkler system to meet NFPA 72,interior and exterior building communications, domestic water, fire water, sewer, electric, awnings, decks, steps and ramps, and sidewalks. ECHO DCL was on-site from mobilization to the completion of all work. An ECHO DCL Superintendent was present from Start to Finish.

Customer Name: Fort Campbell Embedded Health Clinic

Project Name: Fort Campbell EBH
Contract Number: W912DY-12-C-0015
Prime Contractor: ECHO DCL, Inc.
Contract Type: FFP

1. Contract Date: September 30, 2012
2. Mobilization Date: January 21, 2013
3. Completion Date: March 29, 2013

5. Location: Fort Campbell, KY